Home \ News \ Main logistics directions
Home/News/Main logistics directions

Main logistics directions

Main terms:

- From the moment payment is received, the production timeline is 60 days, excluding shipping and logistics.

- The remaining payment can be credited before the BL.

 

Production is organized in two stages:

- Design and packaging development

- Composition development and cost calculation

 

Production timeline

- Mediterranean Shipping Company (MSC): One of the largest in the world, headquartered in Geneva.

- Maersk: A Danish company considered the world leader in cargo turnover.

- CMA CGM Group: A French company that holds a leading position in the industry.

- COSCO Group: The largest Chinese shipping company.

Request a Quote
We reply within 1 business day
Download the catalog
Indicates required fields
Your name:*
Indicates required fields
Work email:*
Indicates required fields
Строка ввода:*
Indicates required fields
Input text:*
Indicates required fields
Область ввода:*
Indicates required fields
Галочка*
Thanks! The form is submitted
Get in Touch
and we’ll get back to you at your convenience
Indicates required fields
E-mail:*
Indicates required fields
Телефон:*
Indicates required fields
Галочка*
Thanks! We’ll be in touch soon